Pulaski Heights United Methodist Church Phase I & II
Phase I included a new 3-level, 66,000 sf renovation and addition, providing 27 new classrooms; an indoor playroom; multi-purpose assembly hall with electronic audio-visual capabilities; 2-level parking deck with a sky-bridge connecting the buildings.
Phase II was the remodel of the main building's first floor; renovation of the Children's Building; and an addition to the Administration Building. An additional sky-bridge was added to connect the buildings.
Advanced offered multiple solutions that included a Gamewell-FCI emergency evacuation system, LENEL access control, CCTV system, and a security system. East-Harding was the general contractor and Clark Power Corp. was the electrical contractor.
"Moving to our new facility meant an entirely new IT infrastructure. We were looking for cutting-edge technology that could seamlessly integrate into our existing servers while also allowing for expansion. Advanced provided the complete solution, from concept and design to coordination and installation. They treated each piece of our project as if it were their own facility."